Zhenggang proposed a comprehensive upgrade featuring state-of-the-art crushing and grinding equipment designed specifically for the client's copper ore characteristics and production requirements.
Detailed analysis and measurements
Custom engineering and planning
Equipment delivery and setup
Operator and maintenance training
The equipment upgrade delivered exceptional results that exceeded the client's expectations across all key performance indicators.
| Metric | Before | After | Improvement |
|---|---|---|---|
| Monthly Downtime (%) | 18 | 9 | -50 |
| Maintenance Cost ($/month) | 85000 | 52000 | -39 |
Achieved target production capacity within first month of operation
Energy consumption reduced by 1.2 MW average during operation
Equipment availability increased from 82% to 91%
Maintenance intervals extended from 30 to 60 days
ROI achieved in 18 months, 6 months ahead of projection
Annual savings of $1.8M in operational costs
Annual savings of $1.8M in operational costs
Annual savings of $1.8M in operational costs
Annual savings of $1.8M in operational costs
"The partnership with Zhenggang has been transformative for our operation. Not only did they deliver world-class equipment, but their engineering team worked closely with us to optimize every aspect of the installation. The results speak for themselves - we've increased production by 45% while significantly reducing our operating costs. This investment will pay dividends for years to come."





Our experienced engineers can design a custom solution to increase your processing capacity and reduce operational costs